We recently received an letter informing us that we need a TV licence for Cowieswells. We informed them that a roof would probably be more us but it has been pointed out that there is a TV aerial!
Things are progressing well. In the main house the opening in the walls are pretty much finished and the steel is in for the upstairs. The roof should go on next week. Really felt like things were progressing this week. The builders reckon that that are about two weeks behind schedule due to the weather and having to take down the gable well at the east end of the house. If it's only two weeks then we are not going to complain.
Even more exciting in the Bothy. The slates have arrived for the roof, the velux windows are in and inside the stud work has gone up for the interior walls giving a real feel for how its going to look and feel once its all done.
|
Main house, steel up for the floor. Note the TV aerial. |
|
View east in the main house. There is that curved piece of steel! Note also that the end wall and gable have been taken down to make the opening to the lounge |
|
Slate for the bothy roof |
|
Inside the bothy. Really taking shape now |
|
The east end of the bothy is open to the roof. Looks very cosy. |
|
Upstairs in the bothy. A single bedroom. |